Laserfiche WebLink
N40e 1%0 <br /> potassium, selenium, silver, sodium, thallium,tungsten,vanadium, and zinc. <br /> Sample collection and preservation procedures are described in Appendix A. <br /> 3. REPORTING <br /> The investigation results will be presented in a technical report. The report will include a <br /> summary of the investigation results, boring logs, analytical results, and site maps presenting the <br /> _ analytical data. <br /> 4. SCHEDULE <br /> ETIC anticipates drilling the exploratory boring and installing the injection well points on 20 <br /> September 2004 pending approval from the SJCEHD. A report of the investigation will be <br /> submitted to the SJCEHD within 90 days after the field work is completed. ETIC will keep the <br /> SJCEHD informed of the status of the investigation. <br /> G\Roge \73942N STER\W\W 9W\W ,\e 2.d.c 3 <br />