Laserfiche WebLink
:.l ",o <br /> INJECTION POINT DEVELOPMENT <br /> The injection points are developed no less than 72 hours after completion. Development consists of <br /> purging the well with a peristaltic pump or bailer until the water is free of silt and apparent turbidity. <br /> A record of the purging methods and volumes of water purged is maintained. All purge water is <br /> contained on the site in properly labeled 55-gallon drums. Purged water is transported to an <br /> appropriate treatment facility. <br /> GASHAR MD bgy� um�toc -Injection PomtWell Imta0 im doc 3 <br />