Laserfiche WebLink
The observation wells will be monitored for the following parameters before, during, and after <br /> the pilot tests: <br /> • Percent oxygen <br /> • Depth to water <br /> • Vacuum/Pressure <br /> The sparging wells are expected to be monitored for the following parameters during the pilot <br /> tests: <br /> • Pressure <br /> • Air flow rate <br /> Please note that site and well conditions may not allow the monitoring of all observation wells <br /> for all the parameters listed above. Additionally, field data may indicate that testing of all of the <br /> wells is not warranted, and the scope of work, therefore, would be reduced. <br /> 4. SCHEDULE <br /> ETIC anticipates performing the pilot test in August or September 2004, pending approval from <br /> the SJCEHD. A report of the pilot test findings will be submitted to the SJCEHD within 45 days <br /> of the completion of the pilot test. <br /> GWojettsV3942U1ASTER\WP\WPp�06\WFexv.doc 2 <br />