Laserfiche WebLink
Continued Monitoring <br /> Groundwater will continued to be gauged on a quarterly basis. Samples will be collected from <br /> the wells and analyzed for TPH-g, BTEX, and MTBE, by EPA Methods 8015/8020. <br /> L <br /> PROPOSED SCHEDULE <br /> ` Field work for the soil gas investigation is tentatively scheduled for December 2000. Completion <br /> of field work is contingent on approval of this work plan by the San Joaquin County Public <br /> Health Services (SJCPHS). The results of this investigation and the risk evaluation will be <br /> ` presented in a report of investigation and discussed during the next meeting between <br /> ExxonMobil and the SJCPHS representatives. <br /> r <br /> r <br /> r <br /> r <br /> r <br /> L <br /> L <br /> 6. <br /> 6. <br /> L <br /> L <br /> E:\R).. 394ZM STMWMw,i 0pmx 3 <br />