My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006126
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:12:56 PM
Creation date
4/10/2020 2:13:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006126
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' PROTOCOLS FOR QUARTERLY GROUNDWATER MONITORING <br />' GROUNDWATER GAUGING <br /> Wells are opened prior to gauging to allow the groundwater level in the wells to equilibrate with <br /> atmospheric pressure The depth to groundwater and depth to liquid-phase hydrocarbons, if present, <br /> are then measured to the nearest 0 01 feet using an electronic water level meter or optical interface <br />' probe The measurements are made from a permanent reference point at the top of the well c asing <br /> If less than i foot of water is measured in a well, the water is bailed from the well and, if the well <br /> does not recover, the well is considered"functionally dry " Wells with a sheen or measurable liquid- <br /> phase hydrocarbons are generally not purged or sampled <br /> WELL PURGING <br />' After the wells are gauged, each well is purged of approximately 3 well casing volumes of w <br /> PP Y iter to <br /> provide representative groundwater samples for analysis Field parameters of pH, temperature, and <br />' electrical conductance are measured during purging to ensure that these parameters have stabilized <br /> before groundwater in a well is sampled Groundwater in each well is purged using an inertial pump <br /> (WaTerra), an electric submersible pump, or a bailer After the well is purged, the water level is <br />' checked to ensure that the well has recharged to at least 80 percent of its original water level <br /> GROUNDWATER SAMPLING <br /> After urging, groundwater in each well is <br /> purging,� � sampled using dedicated tubing, and an inertial pump <br /> I (WaTerra) or a factory-cleaned disposable bailer Samples from extraction wells are typcally <br /> collected from sample ports associated with the groundwater remediation system Samples collected <br /> for volatile organic analysis are placed in Teflon septum-sealed 40-milliliter glass vials Samples <br /> collected for diesel analysis are placed in I-liter amber glass bottles Each sample bottle is labeled <br /> with the site name, well number, date, sampler's initials, and preservative The samples are placed in <br /> a cooler with ice for delivery to a state-certified laboratory The information for each sample is <br /> entered on a chain-of-custody form prior to transport to the laboratory <br /> I <br /> I <br /> I <br /> PrOIULt� \un11n✓7II'`I Isr4 IL %nn&lubI HI\Ilk i-nlnl I n[1\16 Troloj purl a uL'TI LILx_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.