Laserfiche WebLink
I <br /> ADDITIONAL ACTIVITIES PERFORMED AT SITE <br />' No additional activities were performed at the site <br />' WORK PROPOSED FOR NEXTQ UARTER <br />' Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br /> The UVB system will remain shut down <br /> In March 2003, a feasibility study and work pian for well installation was submitted to San Joaquin <br /> County Public Health Services ExxonMobil is currently assessing various remedial technologies for <br /> field testing <br /> Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by WB <br /> System <br />' Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> UVB System <br /> Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br /> Table 4 Operation and Performance Data - WB System <br /> Table 5 Summary of Analytical Results - UVB System <br /> Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> I <br /> g 1pmjmts173942vn terlwp%gU304%3942text Jou 5 <br />