Laserfiche WebLink
1 <br /> • ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> No additional activities were performed at the site <br />' WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' The UVB system will remain shut down <br /> In March 2003, a feasibility study and work plan for well installation was submitted to the San <br /> Joaquin County Public Health Services ExxonMobil Iooks forward to regulatory input concerning <br /> this feasibility study and work plan <br />' Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br />' Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br /> System <br /> 10 Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> UVB System <br />' Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br />' Table 4 Operation and Performance Data - UVB System <br /> Table 5 Summary of Analytical Results - UVB System <br />' Appendix A Field Protocols <br /> Appendix B Field Documents <br />' Appendix C Laboratory Analytical Reports <br /> 1 <br /> 1 <br /> 0 <br /> 9\P-jmts1739421nwsrorlwp1g0603O942tezt dnc 5 <br />