Laserfiche WebLink
I <br />' establishing the surface seal Development will consist of alternately surging and purging the <br /> • well to remove sediment, and develop the sand pack, while monitoring groundwater parameters, <br />' which include electric conductivity, temperature, and pH Details concerning ETIC field <br /> protocol for well development and sampling are presented in Appendix H <br /> 3.4 SAMPLE ANALYSIS <br /> Soil and groundwater samples will be collected for analysis by a state certified laboratory <br /> Selected samples will be analyzed for the following TPH-g by EPA Method 8015B, BTEX by <br /> EPA Method 8021B, and the oxygenates MTBE, t-butyl alcohol (TBA), diisopropyl ether <br /> (DIPS), ethyl t-butyl ether (ETBE), and t-amyl methyl ether (TAME) and the additives ethylene <br /> dibromide (EDB) and 1,2-dichloroethane (1,2-DCA) by EPA Method 8260B Details <br /> concerning ETIC field protocol for sample collection and preservation are presented in Appendix <br /> H <br /> 3.5 WELL SURVEY <br /> Following installation, the well will be surveyed by a state-licensed surveyor The elevation of <br /> the top of the well casing will be measured relative to an established datum Survey protocols <br /> are included in Appendix H <br /> i <br /> I <br /> G lPry"%73942%MASTERIWl 1WM3031WPtx&C 12 <br /> I <br />