Laserfiche WebLink
1. INTRODUCTION <br /> • <br /> I At the request of ExxonMobil Refining and Supply Company(ExxonMobil), ETIC Engineering, <br /> Inc (ETIC) has prepared this work plan to (1) propose the installation of one deep offsite <br /> groundwater monitoring well to provide vertical characterization of hydrocarbon-impacted <br /> I groundwater, and to (2) select and propose a remedial alternative which may be effective <br /> considering site-specific conditions at former Exxon Retail Site (RS) 7-3942, located at 4444 <br /> North Pershing Avenue, Stockton, California (Figure 1) This work plan is written in response to <br />' a letter from the San Joaquin County Environmental Health Department (SJCEHD) to <br /> ExxonMobil dated 27 January 2003, with an extended regulatory due date to 10 March 2003 <br /> (Appendix A) <br /> I <br /> I <br /> I <br /> GSProgem\739421MASTE4t\WKWPO3631WPix d.« 1 <br />