Laserfiche WebLink
1 <br />' ADDITIONAL ACTIVITIES PERFORMED AT SITE <br />' No additional activities were performed at the site <br />' WORK PROPOSED FOR NEXT QUARTER <br />' Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br /> The WB system will remain shut down <br /> ETIC is currently preparing a feasibility study work plan <br />' Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br />' Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br />' System <br /> Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> UVB System <br /> Table I Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br />' Table 3 Groundwater Monitoring Plan <br /> Table 4 Operation and Performance Data - UVB System <br /> Table 5 Summary of Analytical Results - UVB System <br />' Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> g Iprojects\73942Vn tulwpVgp90213942text doc 4 <br />