Laserfiche WebLink
' ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> i <br />' No additional activities were performed at the site <br />' WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' The UVB system will remain shut down <br />' Attachments <br />' Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br />' System <br /> Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> UVB System <br />' Table I Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br /> Table 4 Operation and Performance - UVB System <br /> Table 5 Summary of Analytical Results - UVB System <br />' Appendix A Field Protocols <br /> Appendix B Field Documents <br />' Appendix C Laboratory Analytical Reports <br /> I <br /> I <br /> I <br /> I <br /> 9%projects�73948masterlwp1g060213942tert Juc 3 <br /> I <br />