|
� i• � 1• li � � � 1• � � 1• � � � 1• � � 1•
<br /> • i •
<br /> TABLE 2 GROUNDWATER MONITORING DATA,FORMER EXXON RS 7-3942,4444 NORTH PERSHING AVENUE,STOCKTON,CALIFORNIA
<br /> Casing Depth Groundwater LPH Concentration (yg/L)
<br /> Well Elevation to Water Elevation Thickness Ethyl-
<br /> Number Date (feet) (feet) (feet) (feet) Benzene Toluene benzene Xylenes TPH-g MTBE
<br /> i
<br /> V2 05/08/97 8 15 1920 -1105 000 11,000 29,000 2,900 14,000 170,000 <1,250
<br /> V2 08/26/97 8 15 2074 -1259 000 9,900 45,000 7,300 40,000 270,000 <500
<br /> V2 11/11/97 8 15 2157 -1342 000 12,000 34,000 4,500 22,000 160,000 3,500
<br /> V2 03/03/98 8 15 1595 -780 000 11,000 30,000 3,500 17,000 150,000 <2,500
<br /> V2 03/03/98 815 <200*
<br /> V2 05/20/98 8 15 15 63 -748 000 6,700 22,000 2,500 12,000 100,000 <1,000
<br /> V2 05/20/98 815 <100*
<br /> V2 08/19/98 8 15 17 23 -908 000 3,300 16,000 16,000 7,900 46,000 <500
<br /> V2 08/19/98 815 <100*
<br /> V2 11/18/98 8 15 17 67 -952 000 5,700 21,000 2,600 13,000 86,000 <625
<br /> V2 03/30/99 8 15 1576 -7 61 000 4,830 17,900 2,800 13,300 77,900 <400
<br /> V2 05/05/99 8 15 16 12 -7 97 000 4,590 16,700 2,030 12,300 67,800 <200
<br /> V2 08/20/99 8 15 1755 -940 000 1,400 4,440 517 2,630 20,500 616
<br /> V2 12/06/99 815 -- -- -_ __
<br /> V2 02/29/00 815
<br /> V2 05/16/00 815 --
<br /> V2 09/1 t/00 815 -- -- __ __
<br /> V2 12/13/00 8 15 1760 -945 000 7,100 22,000 4,600 22,600 130,000 <500
<br /> V2 03/08/01 8 15 1679 -864 000 5,700 17,000 4,900 24,100 210,000 <250
<br /> V2 06/21/01 8 15 18 16 -1000 002 -- -- _- __ --
<br /> V2 09/20/01 8 15 1928 -11 13 000 4,800 25,000 6,000 28,600 94,000 <120
<br /> V2 12/04/01 8 11 1907 -1096 000 6,400 16,000 2,800 127800 110,000 <5*
<br /> V2 03/05/02 811 1820 -1009 000 5,590 22,800 2,810 10,200 67,600 h <25
<br /> V3 05/02/91 999 3389 -2490 000 1,900 30,000 5,200 26,000 110,000
<br /> V3 07116-17/91 899 34 86 -25 87 000 840 24,000 3,600 19,000 110,000 --
<br /> V3 10/15/91 899 35 38 -2639 000 1,200 22,000 4,400 22,000 110,000 --
<br /> V3 01/28/92 899 3356 -2457 000 1,100 21,000 4,900 23,000 86,000 --
<br /> V3 04/30/92 899 33 15 -24 16 000 390 15,000 2,800 15,000 62,000 -
<br /> V3 08/13/92 899 3532 -2633 000 620 17,000 4,800 23,000 110,000 --
<br /> V3 10/08/92 899 3596 -2697 000 430 11,000 3,200 17,000 100,000 --
<br /> V3 02/23/93 899 3255 -2356 000 -- -- __ __
<br /> V3 05/18/93 899 -- -- --
<br /> V3 08/22/93 899 M 33 -2234 000
<br /> g1projects1739421rnasler\wp\gO3O2U942gw As Page 34 of 39
<br />
|