My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:18:20 PM
Creation date
4/10/2020 2:53:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006230
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOCT-07--1996 OO 27 EA NORTH SACRHMENTO 1 916 924 7460 P 03/03 <br /> FACSIMILE MESSAGE <br /> This type of groundwater treatment system has been previously implemented at sites where groundwater has <br /> been impacted with petroleum hydrocarbons In 1992, EA installed the first UVB system in the United States at <br /> an Exxon site in Troutman, North Carolina Tn 1994, the U S FPA SITE program demonstrated the use of the <br /> UVB technology at March Air Force Base in California I am marling you a copy of articles written on these <br /> applications <br /> EA is preparing the UVB system design and would like to set up a meeting with you and Ekon the week of 14 <br /> October 1996 EA well present a more detailed look at this technology and relate it to the groundwater situation <br /> at former Exxon RS 7-3942 It is Exxon's intent to receive preliminary approval from the County Public Health <br /> Services Department at tins meeting Once preliminary approval has been recieved, Exxon can proceed with <br /> equipment procurement It is Exxon's intent to move this project along swiftly and install the groundwater <br /> remediation system in November <br /> 41lease call and confirm your availability for the week of 14 October 1996 EA proposes a meeting date of 15 <br /> October at 9 00 am in your office Both EA and Exxon look forward to the implementation of this groundwater <br /> remediation system <br /> 0 <br /> ORIGrNAL WIT,L O FOLLOW VIA MAIL❑FOLLOW VIA OVhRNIGH-'EXPRESS❑FOLLOW VIA MODEM D NO-1 I-OUOW <br /> 9ALTTIMORE NEW YORK SAN FRANCISCe•LINCQLN NEN!JERSEY CHICAGO ATLANTA.DA"AS-CHARLOTCE•WASAING;ON DC aOSTON <br /> SACRAMENTO SEATTLE ALASKA SAN ANTONIO-COLDRADO-HONDLULU DELAWARE <br /> TOTAL F 03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.