Laserfiche WebLink
1 <br /> ADDITIONAL ACTIVITIES PERFORMED AT SITE <br /> I <br /> ExxonMobil is currently completing the laboratory bench scale study as presented in the approved <br />' Work Plan for Benchscale Study and Oxidant Injection Pilot Tests dated December 2404 <br /> WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' The UVB system will remain shut down <br />' Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br />' Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br /> System <br /> Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br />' WB System <br />'. Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br />' Table 4 Operation and Performance Data- UVB System <br /> Table 5 Summary of Analytical Results - UVB System <br />' Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> 1 <br /> 1 <br />' 9\Projects\139421masterlwplg630513942text doe 5 <br />