Laserfiche WebLink
lir � � NJ= <br /> Table 2 (continued)Exxon RS 7-3942 UVB System Performance Parameters <br /> Date Cumulative Vacuum at Air Intake Vacuum UVB UVB Off-Gas Increment Mass Cumulative Mass <br /> Hours of UVB Flowrate at UVB Off-Gas TPH-g A TPH-g Removed of TPH-g Removed <br /> Operation Well Head at UVB Well Blower Flowrate Concentration by UVB System by UVB System <br /> lirs mbar ft3lmin to H2O W/min (ug/1) Ibm) (Ibm) <br /> 01/22/98 63161 30 NM 135 NM NS 1545 61304 <br /> 01/29/98 64818 31 NM 14 NM <10 080 61384 <br /> 02/05/98 66470 32 NM 145 NM NS 080 61463 <br /> 02/20/98 70128 34 NM 15 NM NS 176 61640 <br /> 03/02/98 72501 35 NM 15 NM NS 1 14 61754 <br /> 03/09/98 74187 37 NM 16 NM <10 081 61836 <br /> 03/19/98 76563 41 NM 175 NM NS 1 15 61950 <br /> 03/26/98 7828 3 40 NM 17 NM NS 083 62033 <br /> 04/03/98 80174 45 NM 20 NM NS 091 62124 <br /> 04/16/98 83299 57 935 24 113 <10 1 32 62257 <br /> 06/10/98 8833 8 43 90 18 90 130 2205 64461 <br /> 06/18/98 89820 42 55 NM 95 NS 684 65146 <br /> 06/24/98 91471 45 105 18 131 NS 1051 66197 <br /> 07/02/98 9313 3 55 107 195 108 10 067 66264 <br /> 07/09/98 94820 53 107 185 105 NS 066 66330 <br /> 07/16/98 96492 50 78 20 94 81 476 66806 <br /> 07/23/98 98182 45 78 19 95 NS 486 67293 <br /> 07/30/98 99844 47 80 20 90 19 106 67399 <br /> 08/05/98 101146 53 665 20 769 NS 071 67470 <br /> 08/13/98 101175 55 432 185 615 NS 001 67471 <br /> 08/20/98 101531 45 38 1 19 595 NS 015 67486 <br /> 08/27/98 103206 53 468 195 745 20 093 67580 <br /> 09/04/98 105112 50 455 21 455 NS 065 67644 <br /> 09/11/98 106834 50-55 447 21 55 9 NS 072 677 16 <br /> 09/17/98 108240 54 496 235 705 38 141 67857 <br /> 09/24/98 109916 58 504 25 108 NS 257 681 15 <br /> 10/01/98 111600 62 408 265 102 <10 064 681 79 <br /> 10/08/98 113294 55 445 24 635 21 084 68263 <br /> 10/I5/98 114966 10 NM 5 NM NS 083 68347 <br /> Note Flow values for 09/11/97 are based on the values recorded the following week <br /> *The UVB groundwater treatment system was shutdown between 07/09/97 and 09/11/97 for mamtanance reasons Dunng this period the SVE system was <br /> Mass of TPHg removed(lb)=Concentraiion(uglL)*Off gas Flowrate(cfm)*Hours of Operation(hr)*3 74E 06(lb/ug)(Uft3)(mm/hr) <br /> 2162 •hour meter registered 216 2 hn during troubleshooting prior 10 start up <br /> P IPROJECTS1739421PUBL1C10_&_MIRPTIUVBDATA WB2 <br />