My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_ROY'S AUTO - HISTORICAL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3570
>
2900 - Site Mitigation Program
>
PR0527444
>
ARCHIVED REPORTS_ROY'S AUTO - HISTORICAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 4:53:44 PM
Creation date
4/10/2020 4:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
ROY'S AUTO - HISTORICAL
RECORD_ID
PR0527444
PE
2950
FACILITY_ID
FA0018586
FACILITY_NAME
FORMER ROY KNOLL TOWING
STREET_NUMBER
3570
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339014
CURRENT_STATUS
01
SITE_LOCATION
3570 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FPOM Ground. Zero Analysis PHONE NO. . 209 95299912 Sep, 24 1996 03:54PM P4 <br /> ATTACHMN'T A <br /> COST ESTIMATE FOR SOIL SAMPLING <br /> at <br /> Roy's Towing <br /> 3570 Past Miner Avenue, Stockton <br /> Labor <br /> Registered Geologist 2 hrs $ 95/hr $ 190 <br /> Staff Geologist 8 hrs 65/hr 520 <br /> Technician 14 hrs 45/hr 630 <br /> SUBTOTAL: S 1"340 <br /> Labor <br /> TRPH and total lead 16 samples $ 121/sample 1,936 <br /> EPA 8010 9 samples 92/sample 828 <br /> TRPH and total lead (potential) 4 samples 121/sample 484* <br /> STL.0 lead (potential) 4 samples 92/sample 368* <br /> SUBTOTAL: <br /> ]Equipmen <br /> Drilling contractor 1,187 <br /> Permit 102 <br /> Hand auger k day $ 50/day 50 <br /> Brass liners and caps 24 7.50 each 180 <br /> Surveying equipment 1 day 75/day 75 <br /> Photoionization Detector 1 day 75/day 75 <br /> Drums and Visqueen (for cuttings) 100 <br /> "TOTAL: S1,76 <br /> Raw <br /> SUBTOTAL: , <br /> TOTAL COST ESTIMATE: 18,725 <br /> * Notre: If it proves unnecessary to analyze these samples the total cost will be approximately <br /> $ 7,875 <br /> V«wdw�Mlam <br />
The URL can be used to link to this page
Your browser does not support the video tag.