Laserfiche WebLink
ATTACIVgENT A <br /> COST ESTIMATE FOR SOIL SAMPLING <br /> (THIRD REVISION) <br /> Roy's Towing <br /> 3570 East Miner Avenue, Stockton <br /> Labor <br /> 4 hrs $ 95/hr $ 380 <br /> Registered Geologist 65/hr 520 <br /> Staff Geologist 8 hrs 45/hr 720 <br /> Technician <br /> 16 hrs <br /> $ 1.620 <br /> SUBTOTAL: <br /> Laboratory <br /> les $ 121/sample 1,694 <br /> 14 samples TRPH and total lead only P <br /> TPHg, TPHd, TRPH, 432/sam le 4,752 <br /> EPA 8240 and total lead 11 samples P <br /> 368 <br /> STLC lead (potential) 4 samples 92/sample <br /> L§,.814 <br /> SUBTOTAL: <br /> ui ment <br /> 1,187 <br /> Drilling contractor 102 <br /> Permit 1 da $ 50/day 50 <br /> Hand auger y180 <br /> 24 7.50 each <br /> Brass liners and caps 75/da 75 <br /> Surveying equipment 1 day 75/day 75 <br /> Photoionization Detector 1 day y 100 <br /> Drums and Visqueen (for cuttings) <br /> $ 1,769 <br /> SUBTOTAL: <br /> Report <br /> $ 2 <br /> SUBTOTAL: <br /> $12.203 <br /> TOTAL COST ESTIMATE: <br /> groundu\roy'staw\contest <br />