Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Rov's Towing <br /> Job Location: 3570 East Miner Street, Stockton, California <br /> Client Name: Rov Knoll <br /> Project Number: 96-133 Date: September 9, 1196 <br /> General Work Description: Collect soil samples at 1 and 4.5 feet bQs <br /> SSP Prepared by: Jeanne Buckthal <br /> On-site Safety Officer: Jeanne Buckthal <br /> Project Safety Officer: Grez Stahl <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by all on- <br /> site employees, subcontractors, and visitors prior to entering the site. General safe work <br /> practices are identified in the Ground Zero Analysis, Inc. (GZA) Injury and Illness Prevention <br /> Manual and apply to all GZA work sites. <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors <br /> working for GZA at the job site. All personnel working for GZA at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth in this SSP, but only to upgrade or <br /> increase the safety requirements. GZA personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions set- <br /> forth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures, appropriate amendments to this SSP will be provided by the GZA project manager <br /> or supervisor, with the written approval of a GZA branch safety officer or the GZA Health and <br /> Safety Director. <br />