My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2231-2238 – Tiered Permitting Program
>
PR0515788
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:28:51 PM
Creation date
4/10/2020 5:18:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515788
PE
2832
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
000-027-346-4
CURRENT_STATUS
01
SITE_LOCATION
14749 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 <br /> SPCC Cross-Reference <br /> THREE B'S TRUCK & AUTO PLAZA <br /> 14749 North Thornton Road, Lodi, California <br /> Provision Plan Section Page <br /> 112.3(d) Professional Engineer Certification 3 <br /> 112.3(e) Location of SPCC Plan/ Plan Availability 4 <br /> 112.5 Plan Review 4, Table 1 <br /> 112.7 Management Approval 3 <br /> 112.7 Cross-Reference with SPCC Rule Table 2 <br /> 112.7(a)(3) Facility Description 6 <br /> 112.7(a)(4) 5.4 Discharge Notification 22, Appendix J <br /> 112.7(a)(5) 5.0 Discharge Response 19 <br /> 112.7(b) 3.4 Potential Discharge Volumes and Direction of Flow 10 <br /> 112.7(c) 3.5 Containment and Diversionary Structures 10 <br /> 112.7(d) 3.6 Practicability of Secondary Containment 12 <br /> 112.7(e) 3.7 Inspections, Tests, and Records 12, Appendix B <br /> 112.7(f) 3.7.5 Personnel, Training and Discharge Prevention Procedures 13 <br /> 112.7(g) 3.8 Security 14 <br /> 112.7(h) 3.9 Tank Truck Loading/Unloading 14 <br /> 112.7(1) 3.10 Brittle Fracture Evaluation 15 <br /> 112.70) 3.11 Conformance with Applicable State and Local Requirements 15 <br /> 112.8(b) 4.1 Facility Drainage 15 <br /> 112.8(c)(1) 4.2.1 Construction 16 <br /> 112.8(c)(2) 4.2.2 Secondary Containment 16 <br /> 112.8(c)(3) 4.2.3 Drainage of Berm Areas 16, Appendix D <br /> 112.8(c)(4) 4.2.4 Corrosion Protection 136 <br /> 112.8(c)(5) 4.2.5 Partially Buried and Bunkered Storage Tanks 17 <br /> 112.8(c)(6) 4.2.6 Inspection - Facility Inspection Checklists 17, Appendix C <br /> 112.8(c)(7) 4.2.7 Heating Coils 17 <br /> 112.8(c)(8) 4.2.8 Overfill Prevention System 17 <br /> 112.8(c)(9) 4.2.9 Effluent Treatment Facilities 18 <br /> 112.8(c)(10) 4.2.10 Visible Discharges 18 <br /> 112.8(c)(11) 4.2.11 Mobile and Portable Containers 18 <br /> 112.8(d) 4.3 Transfer Operations, Pumping and In-Plant Processes 18 <br /> 112.20(e) Certification Prior to TOC <br /> Notes: *Only selected excerpts of relevant rule text are provided.For a complete list of SPCC requirements,refer to the full text of <br /> [40 CFR§112]. <br /> CFR:Code of Federal Regulations <br /> SPCCP:Spill Prevention Control and Countermeasures Plan <br /> TOC:Table of Contents <br />
The URL can be used to link to this page
Your browser does not support the video tag.