My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2231-2238 – Tiered Permitting Program
>
PR0515788
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:28:51 PM
Creation date
4/10/2020 5:18:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515788
PE
2832
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
000-027-346-4
CURRENT_STATUS
01
SITE_LOCATION
14749 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 7 <br /> Fuel Transfer Procedures <br /> THREE B'S TRUCK & AUTO PLAZA <br /> 14749 North Thornton Road, Lodi, California <br /> Prior to loading/ 0 Inform facility personnel and gain consent for delivery, unless prearranged. <br /> unloading • All fuel delivery personnel must measure and verify that sufficient volume <br /> (ullage in gallons) is available in the storage tank. 95% of Maximum AST <br /> volume must be measured less than maximum fill line. <br /> • Electronic-Overfill senor operation must be monitored continuously and <br /> verified with Tank tape gauges are reading and accurately measuring Tank <br /> volume. TERMINATE fueling when Electronic-Overfill senor demonstrate <br /> filling at 95% of total. <br /> • Record tank volumes on a checklist prior to work. Calculate the percentage <br /> of the AST available and document,verify with delivery vendors the proposed <br /> volume for delivery. Inspect the Level Display on the loading end of the AST <br /> and review the readings. Ensure the volume for loading is within the ullage. <br /> • Inform facility personnel of ANY overage and WAIT. <br /> • However, this is filled by employees and can be visual inspected from the <br /> surface/top during filling and might be filled to the limit of the AST. <br /> • Most AST are filled by tanker employees, with Facility employee's <br /> inspection. <br /> • Visually check all hoses for leaks and wet spots. <br /> • Lock in the closed position all drainage valves of the secondary <br /> containment structure. <br /> • Secure the tank vehicle with wheel chocks and interlocks. <br /> • Ensure that the vehicle's parking brakes are set. <br /> • Verify proper alignment of valves and proper functioning of the pumping <br /> system. Make sure all values are in the proper positions. <br /> • Establish adequate bonding/grounding prior to connecting to the fuel <br /> transfer point. <br /> • Use bucket when removing all plugs and caps. <br /> • Place drip pans under receiving headers. <br /> • Hook up vapor hose when loading and unloading. <br /> During loading/ 0 When making a connection, shut off the vehicle engine. <br /> unloading Driver must stay with the vehicle at all times during unloading activities. <br /> Periodically inspect all systems, hoses and connections. <br /> • When loading, keep internal and external valves on the receiving tank open <br /> along with the pressure relief valves. When transferring Class 3 materials, <br /> shut off the vehicle engine unless it is used to operate a pump. <br /> • Monitor flow meters to determine rate of flow. <br /> • When topping off the tank (95% Maximum), reduce flow rate to prevent <br /> overflow. <br /> After loading/ 0 Make sure the transfer operation is completed. <br /> unloading Close all tank and loading valves before disconnecting. <br /> • Securely close all vehicle internal, external, and dome cover valves before <br /> disconnecting. Secure all hatches. <br />
The URL can be used to link to this page
Your browser does not support the video tag.