Laserfiche WebLink
f. No trees and/or rubbish will be disposed of or stored on the District's easement or <br /> facilities. <br /> g. The District will be notified 48 hours in advance of any excavation work. <br /> h. The land owner shall agree that the existing pipeline or concrete-lined canal do n t <br /> presently leak and that any damage will be repaired at the land owner's expense. <br /> i. It is understood by the applicant that the District shall not be held responsible to remedy <br /> high water table problems created by the excavation. <br /> j. The land owner shall provide the District with sufficient fill dirt from excavation for the <br /> protection of the canal or pipeline and place the fill dirt as directed by the District's <br /> Engineering Department. <br /> k. Any irrigation service structure(District or private) modification or installation necessitate <br /> by the proposed excavation shall be performed at the land owner's expens . <br /> Furthermore, the owner shall obtain a Structure Permit from the District prior to installing, <br /> modifying, or removing any irrigation structures on District facilities. <br /> I. The above Conditions of Approval shall be placed on the Improvement Plan. <br /> M. The Improvement Plan, showing all District easements, shall be submitted to the District' <br /> Board of Directors for approval and signature. <br /> 5. PACIFIC GAS AND ELECTRIC COMPANY: <br /> a. There shall be no excavations within 10 feet of any existing PG&E poles. <br /> b. Any necessary relocation of power poles shall be at the owner's expense. <br /> Amended Conditions -3 - GX-92 9 <br />