My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009401
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
401
>
2900 - Site Mitigation Program
>
PR0505260
>
ARCHIVED REPORTS_XR0009401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:14:24 PM
Creation date
4/13/2020 1:11:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009401
RECORD_ID
PR0505260
PE
2950
FACILITY_ID
FA0005154
FACILITY_NAME
FEDERAL BUILDING/US POST OFC
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13915005
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvements that include vegetation and the main building structure located north of <br /> UST "B", a 12-foot long by 6-foot wide planter box located south of UST "B", and an <br /> electrical vault located approximately 1-foot west of UST "B". <br /> CEMI contracted the services of West Hazmat Drilling, from Sacramento, California, <br /> for the drilling operations Prior to advancing the hollow-stem auger, a hand auger was <br /> advanced to a depth of five (5) feet bgs for the purpose of identifying any unmarked <br /> subsurface utilities West Hazmat Drilling utilized an Acker dnll ng with an eight (8) <br /> inch outside diameter (OD) hollow stem auger in five (5) foot lengths <br /> Drill augers were steam cleaned prior to advancement Soil sampling equipment (sample <br /> tube and rings) was decontaminated with Alconox detergent and rinsed with tap water <br /> prior to and following each sample Soil cuttings and decontamination fluids were <br /> contained, placed in the drums, labeled, and stored in a secured area on-site A total of <br /> three (3) fifty-five (55) gallon drums were generated The generated material is slated <br /> for proper disposal following completion of the UST excavation. <br /> On June 30, 1994 CEMI conducted the subsurface soil investigation and supervised the <br /> advancement of four (4) soil borings identified as bonngs B1, B2, B3, and B4 Soil <br /> boring locations are identified in Figure 2 <br /> K084023 RPT 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.