My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009401
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
401
>
2900 - Site Mitigation Program
>
PR0505260
>
ARCHIVED REPORTS_XR0009401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:14:24 PM
Creation date
4/13/2020 1:11:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009401
RECORD_ID
PR0505260
PE
2950
FACILITY_ID
FA0005154
FACILITY_NAME
FEDERAL BUILDING/US POST OFC
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13915005
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 UNDERGROUND STORAGE TANK REMOVAL CONSIDERATIONS <br /> Considerations for removal of the two 5,000 gallon UST's are as follows• <br /> • A 12-foot long by 6-foot wide block planter box built on a concrete pad and of <br /> cinderblock construction may obstruct excavation activities for UST removals <br /> Considerations for the removal and replacement of this planter box should be <br /> made prior to UST removals. <br /> • A subsurface electrical vault, constructed of cast-in-place concrete, is located <br /> approximately 2 feet west of UST "B" and may obstruct excavation activities and <br /> prohibit the use of heavy equipment in the area, due to cave-in potential <br /> Considerations for excavation shoring and limited access of heavy equipment <br /> should be made prior to UST removals <br /> • The main buildingstructure 1s located approximately 7 feet north of UST "B" and <br /> PP Y <br /> the integrity of the structure may be compromised during excavation activities <br /> Considerations for excavation shoring should be made prior to UST removals <br /> • Vegetation (shrubbery) is located approximately 2 feet north of UST "B" and may <br /> be disturbed during excavation activities Considerations for the protection and/or <br /> K084023 RPT 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.