Laserfiche WebLink
Cape Enwranmental Management,Ir►a <br /> Health&Safety Plan <br /> E. ACTION EVE <br /> TABLE 1 <br /> Monatorang Action* <br /> Work Zone F4uipmen Level Action <br /> Breathing Zone PID** 1-5 units Monitor and record results <br /> initially and at least every <br /> 30 minutes. <br /> 5-20 units All personnel will <br /> immediately leave the work <br /> area and contact the Project <br /> Manager and CEMI Plan <br /> Reviewer. When levels of <br /> hydrocarbons, 5 ppm for 60 <br /> seconds, are detected, <br /> draeger tubes will be used <br /> as an indicator for benzene. <br /> With their approval, <br /> personnel may re-enter the <br /> work zone using Level C <br /> protection. Monitor and <br /> record results at least every <br /> 15 minutes. <br /> 20+ units All personnel will <br /> immediately leave the work <br /> area after covering the <br /> contaminated sods and <br /> contact the Project Manager <br /> and CEMI Plan Reviewer. <br /> 3 inches PID** C 10 units Monitor and record <br /> Above Soil results initially and at least <br /> every 30 minutes. <br /> 10-50 units All personnel will <br /> immediately leave the <br /> work area after <br />. K064032 HSP 9 <br />