Laserfiche WebLink
Mr. Eric J. Holm <br /> March 26, 1997 <br /> Page 8 <br /> plumes beneath the Site. <br /> 4. Holz has a history of using solvents including acetone, MEK, and MIK. <br /> Therefore, DTSC requires that soil gas samples be analyzed for acetone, MEK, <br /> and MIK, in addition to other VOCs and BTEX. Please notify your soil gas <br /> contractor to include analysis for these specified compounds for samples <br /> collected, and report any other chemicals detected. <br /> 5. Soil samples should be collected for analysis of metals of concern(metals <br /> detected in BEM sampling), semi-VOCs, phenolic compounds, and TPH. <br /> Additionally, representative soil samples should be analyzed for moisture <br /> content, organic contents, bulk density, and porosity to determine the soil <br /> characterization beneath the Site. The soil characterization data are to assist the <br /> development of site-specific cleanup levels for the Site. <br /> 6. DTSC is also requiring the following additional information be provided <br /> prior to the site visit: <br /> (a) Copies of the wastewater sampling results for the wastewater discharged <br /> into the City's sanitary and industrial sewer lines be provided prior to field <br /> sampling; <br /> (b) Soil boring logs collected by BEM; and <br /> (c) A map showing sewer lines and floor drains connecting to the City's <br /> sanitary and industrial sewer lines, as well as chemical pipelines located at <br /> the Site. <br /> In response to Holz's request for the earliest sampling as possible, DTSC <br /> would like to arrange the site visit with you or your staff as soon as possible to <br /> refine the soil gas sampling locations. Submittal of an addendum to incorporate <br /> the above comments including the finalized soil gas sampling locations will be <br /> adequate. The addendum should be submitted within 15 days, or earlier, upon <br /> completion of the field visit. Please note that soil gas sampling locations may <br /> subject to further changes based on field sampling results. Please coordinate with <br /> DTSC on field sampling dates and notify DTSC five (5)days in advance of the <br /> field sampling date. <br />