My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
1129
>
2900 - Site Mitigation Program
>
PR0518901
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:30:51 PM
Creation date
4/13/2020 1:23:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518901
PE
2960
FACILITY_ID
FA0014202
FACILITY_NAME
HOLZ RUBBER CO
STREET_NUMBER
1129
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
1129 S SACRAMENTO ST
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Mary Meays <br /> September 4, 1997 <br /> Page 2 <br /> boring, or if the boring is greater than 30 feet bsg,the neat cement grout will be installed with a tremie <br /> pipe up to a depth of 30 feet bsg. <br /> Soil Stockpile Samplinz and Disposal <br /> Soil generated during installation of monitoring wells,geoprobe and hand auger borings, and soil vapor <br /> probes will be stockpiled on plastic sheeting pending laboratory analytical results. Four soil samples <br /> will be collected from each 50 cubic yards of stockpiled soil, with each set of four samples to be <br /> composited in the laboratory prior to analysis. The stockpile soil samples will be submitted to a <br /> state-certified laboratory for chemical analysis. The samples will be analyzed for total petroleum <br /> hydrocarbons (TPH) as diesel, TPH as gasoline, benzene,toluene, ethylbenzene, total xylenes, volatile <br /> organic compounds, and CAM 5 metals. Based on laboratory analytical results, an appropriate <br /> disposal facility will be selected. The soil will be disposed of within 90 days of its generation date. <br /> Installation of the six ground water monitoring wells is scheduled to begin on September 8, 1997. The <br /> geoprobe, hand auger, soil vapor probe-phase of this investigation has not been scheduled to date.Your <br /> expedient review of our well permit applications is greatly appreciated. I will call you this afternoon or <br /> tomorrow morning to schedule a grout inspection for Monday, September 8th. <br /> If you have any questions regarding this matter, please do not hesitate to contact myself or Eric Holm <br /> at(916) 638-2085. <br /> Sincerely, <br /> DELTA ENVIRONMENTAL CONSULTANTS, INC. <br /> Michael A. Berringto <br /> Project Geologist <br /> MAB(CLoo4.o9o) <br /> Enclosure <br /> cc: Mr. Eric J. Holm, Delta Environmental Consultants, Inc. - Sacramento <br />
The URL can be used to link to this page
Your browser does not support the video tag.