Laserfiche WebLink
ROSE MARIE LANE <br /> • '•. �s <br /> MW-1 <br /> ••• <br /> (-2229) <br /> I � <br /> Waste ' <br /> • Oil --- <br />' • Tank <br /> 's New Tank Locat <br /> ••'� - ------------ <br /> LU <br /> • 22 <br /> Approximate ScaleOS _ _________ _____ <br /> 1" = 20' --- --------- --- z <br /> • , <br /> 22 W <br /> I t} 20 --- -------- - <br /> Station 2r _ <br /> udding ss - z <br /> r = <br /> rW <br /> pY a <br /> MW-2 , Aaid <br /> /ZA r <br /> {-2194) , DiS user r <br /> loll Isla ds ' <br /> {-2215) r <br /> VEW-2 <br /> - <br /> MW-4- <br /> Pilot' <br /> �0=_____________•----------:'__�" VEW-1 <br /> Test -----' <br /> NOTE Site sketch after Area -0 <br /> tank replacement plan <br /> 4445 Pershing Avenue Eoc% ,�� M I <br /> by R H Lee&Associates % <br /> (-2-227 <br /> Contour Interval a 0 05 ft • <br /> Hydraulic Gradient a 0 004 ftift • <br /> LEGEND ♦.z <br /> Monitoring Well • <br /> Product Line Locations Unknown <br /> Monitoring Well (Exxon) <br /> FIGURE 4 <br /> Vapor Extraction Well POTENTIOMETRIC SURFACE MAP <br /> January 21, 1992 <br /> (-2227)/ Groundwater Elevation Shell Service Station WIC # 204-7524-2408 <br /> 4.445 Pershing Avenue <br /> .22 10 Potentiometric Surface Stockton, Ca. <br /> Contour <br /> AEGIS Job Number 89-016 <br /> Estimated Direction Of DRAWN BY Ed Bernard DATE March 19, 1992 <br /> Groundwater Flow REVIEWED BY rhSR DATE 4-'b-1z- <br />