Laserfiche WebLink
BORINGMELL CONSTRUCTION DETAIL GRAPHIC DESCRIPTION <br /> PID LOG <br /> (ppmv) <br /> 12 12 no�oa <br /> D C a o <br /> Now Cement a O 6 a go <br /> 13 13 " opo <br /> Blank <br /> PVC Casing 0 01 0 0 Gray to brown clayey SILT(ML),damp no odor <br /> 14 14 00 00 <br /> o <br /> F 15 15 <br /> LLI <br /> uV <br /> Lu 16 Beraonne 16 <br /> Q Seal <br /> li <br /> n 17 17 0 00 <br /> z00 00 <br /> o 000 00 00 <br /> °C <br /> 018 18 <br /> O <br /> in19 1 Petroleum odor <br /> F— #3 Sand 0 <br /> a- <br /> Lu <br /> 20 20 <br /> Slatted 0 020 <br /> PVC Casing <br /> I21 21 <br /> 22 22 <br /> 23 23 <br /> r24 24 Petroleum odor <br /> ItJ � lt � � ftltl <br /> Inch Radius 0 2 4 6 <br /> Explanation Contacts <br />' = Water level during drilling Solid where certain 0 Aff= d <br /> Water level in completed well Dotted where approximate <br /> Bonng/Well Log JOB NUMBER <br /> Location of recovered drill sample Dashed where uncertain <br /> Monitoring Well 4 (continued) 89-016 <br /> . Locationotsample sealed for •l1/i Hachuredwhere gradational BARING/ <br /> chemical analysts Shell Service Station <br /> eat K Estimated permeability' WIG#204 7524 2408 WELL® Sieve sample (hydraulic conductivity) <br /> 1K-primary 2K.secondary 4445 Pershing Avenue <br /> ® Grab Sample Stockton,CA MW-4 <br /> Na No Recovery <br />