Laserfiche WebLink
SHELL WELL MONITORING DATA SHEET <br />• Project #: &5 Wic #: .5 <br /> Sampler: (l/ Start Date: <br /> Well I.D. : Ail/ q_ Well Diameter: (circle one) 2 1:::4:26 <br /> Total Well Depth, Depth to Water: <br /> Before V-� After Before Z'5 After <br /> Depth to Free Product: Thickness of Free Product (feet) : <br /> Measurements referenced to: PVC Grade Other: <br /> Well Diameter VCF Well Diameter VCE' <br /> 1" 0.04 6" 1.47 <br /> 2" 0.16 8" 2.61 <br /> 3" 0 37 10" 4 08 <br /> 4" 0 65 12" 5 87 <br /> 5" 1 02 16" 10.43 <br /> lex t <br /> 1 Case Volume Specified volumes - gallons <br /> Purging: Bailer Sampling Bail <br /> Disposable Bailer Disposable Basler <br /> Middleburg Extraction Port <br /> Electric Submersibles Other <br /> Extraction Pump <br /> Other <br /> i <br /> TIME TEMP pH COND. TURBIDITY: VIOBSERVATIONS. <br /> F � D. <br /> 5 �� •Z o /ass <br /> r(o �1 �Orzt::� 0 A 0 <br /> /47 <br /> Did Well Dewater?JTJ If yes, gals. Gallons Actually Evacuated Z <br /> Sampling Time: f� Sa=pling Date: <br /> Sample I.D l Laboratory: / <br /> Analyzed for: �,rn B TPH-D OTHER: <br /> 5 <br /> (Circle) <br />• Duplicate I.D L I } Cleaning Blank I.D <br /> Analyzed for: - E TPH-D OTHER: <br /> (Circle) <br />