Laserfiche WebLink
Remolmbon Plan <br /> Cleanup and Abatement Order No 5-00-707 EAI Protect No 1232 <br /> 8.0 ANALYTICAL CONTROL AND REPORTING <br /> The following analytical control schedule is proposed <br /> VOCs reading using a portable instrument will be taken from all vapor extraction wells <br /> on a monthly basis <br /> • Dissolved oxygen in ground water from existing monitoring wells locate inside the TPH <br /> plume will taken on a monthly basis <br /> + Air samples from the inlet of the oxidizer and the stack will be taken on a quarterly <br /> basis to comply SJCAPCD permit requirements The samples will be analyzed in an <br /> 1 offsite laboratory for TPH and BTEX Additionally, one air sample will be taken from <br /> the inlet of the oxidizer to be analyzed for carbon dioxide and oxygen to assess the <br /> effect of biodegradation <br /> i • Ground water monitoring will continue on a quarterly basis <br /> Quarterly ground water monitoring and quarterly remediation system operational reports will <br /> be prepared and submitted <br /> BS 1232P RAP ADD <br /> ENVIRONMENTAL AUDIT,INC <br />