Laserfiche WebLink
E11�ytg <br /> Mr James Barton <br /> June 14, 2004 <br /> Page 8 <br /> ' Monitoring and Test Well Surveying <br /> A state-certified surveyor will survey each newly Installed well Survey data will Include <br /> northing, easting, well-box elevation, well casing elevation, latitude, and longitude Horizontal <br /> coordinates by the global positioning system (GPS) will also be obtained by the surveyor <br /> Permitting and Scheduling <br /> If warranted, ENSR will submit soil boring/well installation permit applications to the SJCPHS <br /> Following approval of well installation permits the proposed scope of work will be implemented <br /> Remarks/Sig natures <br /> The Interpretations contained in this work plan represent our professional opinions, and are <br /> based in part, on Information supplied by the client These opinions are based on currently <br /> available information and are arrived at In accordance with currently accepted hydrogeological <br /> ' and engineering practices at this time and location Other than this, no warranty is Implied or <br /> Intended <br /> If you have any questions regarding this project, please contact Ben Henmgburg at <br /> (916) 362-7100 <br /> G � <br /> Sincerely, <br /> ENSR Corporation �� MAIC <br /> CAPPS .a <br /> NO.6561 <br /> 04"n I In urg Mark Capps, R G 1 //-3a <br /> Senior Project M ager Senior Protect Man <br /> BH/mg � C�►�®��� <br /> Ref 06940-293-120 <br /> Attachments <br /> ecc Mr Bob Hopkins, Union Oil Company of California <br /> Mr Mike Infurna, San Joaquin County- Environmental Health Department <br /> Mr Mark Naugle, ENSR International <br /> Ms Jill Tracy, Esq , Union Oil Company of California <br /> Mr Jay Allen, Stone Brothers Management Company <br /> Mr Gary Hall, GHH Engineering, Inc <br /> J kProjectsk0694015098-2931FinahReportsk5O98 Work Plan doc <br /> Over 30 Years of Excellence in Enwicinrnenfaf Services <br />