My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
1825
>
2300 - Underground Storage Tank Program
>
PR0540852
>
REMOVAL_2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2025 1:19:46 PM
Creation date
4/14/2020 8:39:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2016
RECORD_ID
PR0540852
PE
2361 - UST FACILITY
FACILITY_ID
FA0023354
FACILITY_NAME
CCJ & S LLC (VACANT PROPERTY)
STREET_NUMBER
1825
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95205
APN
15514015
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1825 E DR MARTIN LUTHER KING JR BLVD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to IVEL ; <br /> MAR 0 2 2016 <br /> BACKFILL EXCAVATION CERTIFICATE ENVIRONMENTAL <br /> !_li,!!TU 1'1CD!�CITARC!11T <br /> Project Location- <br /> 47 LST /� .� -l� ✓� >lG���� C�, <br /> Owner ��� S' <« Phone No:_2n c'5o2 2� <br /> Contractor: �� TO��� �/� j�J�• Phone No: <br /> License No: <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that <br /> one of the following materials was placed in the excavation in 12" lifts: <br /> A. Pea gravel--smooth, rounded material not more than one-half (1/2) <br /> inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock will <br /> not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar <br /> materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum) of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> *Name <br /> nn <br /> Title 1, P;'� /C L <br /> Signature <br /> *Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.