Laserfiche WebLink
Food Express, Inc. - Lathrop, CA <br /> PLAN CROSS-REFERENCE(40 CFR 112.7) <br /> SPCC <br /> Regulation Description of Requirement Section <br /> 40 CFR <br /> 112.1 General Applicability Page 3 <br /> §112.3 Requirements to Prepare and Implement an SPCC Plan <br /> §1.12.3(d) Professional Engineer Review and Certification Page 5 <br /> §112.3(e) Location of the SPCC Plan Page 5 <br /> §112.4 Amendment of SPCC Plan by Regional Administrator Page 6 <br /> §112.5 Amendment of SPCC Plan by Owner/Operator Page 6 <br /> §112.6 Qualified Facilities Plan Requirements Page 7 <br /> §112.7 General Requirements for SPCC Plans <br /> General Requirements; Discussion of Facility's Conformance <br /> with Part 112 Requirements; Facility Diagrams; Facility Appendix A <br /> §112.7(a) Description; Discharge Prevention Measures; Discharge and <br /> Drainage Controls; Discharge Countermeasures;Recovered Page 7 -27 <br /> Material Disposal; Contact Lists and Phone Numbers <br /> §112.7(b) Failure Analysis Page 22 <br /> §112.7(c) Secondary Containment and Diversionary Structures Page 23 <br /> §112.7(d) Contingency Planning Page 24 <br /> §.l 12.7(e) Inspections,Tests,and Records Page 24 <br /> §I 12.7(f) Personnel Training and Discharge Prevention Procedures Page 25 <br /> §11.2.7(g) Security Page 26 <br /> §l 12.7(h) Facility Tank Truck Loading/Unloading Page 27 <br /> §I 12.7(i) Brittle Fracture Evaluation Page 27 <br /> §112.70) Conformance with State Requirements Page 27 <br /> §I 12.7(k) Qualified Oil Filled Operation Equipment Page 27 <br /> §112.8 Requirements for Onshore Facilities <br /> §112.8(a) General and Specific Requirements Page 28 <br /> §1 I2.8(b) Facility Drainage Page 28 <br /> §I 1.2.8(c) Bulk Storage Containers Page 28 <br /> §l 12.8(c)(1) Construction Page 28 <br /> §I 12.8(c)(2) Secondary Containment Page 28 <br /> §112.8(c)(3) Drainage of Diked Areas Page 28 <br /> §I12.8(c)(4) Corrosion Protection Page 28 <br /> §11.2.8(c)(5) Partially Buried and Bunkered Storage Tanks Page 28 <br /> §I 12.8(c)(6) Inspections Page 29 <br /> §I 12.8(c)(7) Heating Coils Page 29 <br /> §112.8(c)(8) Overfill Prevention System Page 29 <br /> §112.8(c)(9) Effluent Treatment Facilities Page 29 <br /> §112.8(c)(10) Visible Discharges Page 29 <br /> §1.12.8(c)(11) Mobile and Portable Containers Page 29 <br /> §I12.8(d) Facility Transfer Operations, Pumping,and Facility Process Page 29 <br /> A.4X[N <br /> 1 <br />