Laserfiche WebLink
7.0 Next Scheduled Formal Inspection <br /> Comments <br /> he tank is equipped with spill control and/or CRDM (continuous <br /> release detection method)and is considered a Category 1 tank per <br /> able 5.5 of STI SP001.The next formal inspection would be required <br /> in 20 years or as required by the sites SPCC Plan.The inspection <br /> Formal Inspection Is Required in (years): schedule is based on the site completing the recommended repairs <br /> as noted in the inspection report. If problems are identified during <br /> periodic inspections a formal inspection may be required sooner. <br /> The condition of the equipment may change after the issuance of <br /> his report. <br /> Other <br /> 7 <br />