Laserfiche WebLink
8 . Building Inspection Division : <br /> a. The design of the waste oil recovery structures shall <br /> comply with current seismic requirement of the Uniform <br /> Building Code. (EIR) <br /> b. oil tanks shall be bolted to raised concrete pads and a <br /> polyethylene membrane shall be installed between the <br /> tanks and the concrete pads . (EIR ) <br /> 9. 2. 02. 25H - 11 - 6/12/89 <br />