Laserfiche WebLink
�,. All feedstock materials stored on site shall be contained on a contiguous e�Q1f <br /> pre—determined 3 acre lot with material piles to be 15 foot or less. plyt�i <br /> 43. <br /> Waste Oil as received or blended to meet specs may not be added to briquettes. <br /> �4 . The hose streams required to control dust and fire hazards shall be in place <br /> on the entire three acre storage site prior to acceptance of biomass materials. _ <br /> W1/k VJ1 M orf, 6•% sp-teI{icJ <br /> Separate ponding facilities will be constructed and maintained to store run—off <br /> water and contaminated water. pwbf6 , <br /> Fugitive emissions from water evaporation during recycling process shall need <br /> APCD standards and be monitored separately -and on regular basis. Minn, <br /> ..w/f-fe ►;I <br /> All off—spec materials as identified by laboratory analysis shall be recorded, <br /> documented separately and reported to the Department of Health Services within <br /> 24 hours. <br /> If an of the contaminant tests required are unable to be completed on site at <br /> the time of delivery, material will be tested off—site and results made available <br /> prior to acceptance of material. WJ acll**� ft✓ �y <br /> A cl,e-s-e+ powered generator will be permanently located on site to insure adequate <br /> flow of water for fire protection. <br /> No expansion of waste oil holding facilities (tank farm) will be allowed wit�iout <br /> addition permit requiring public hearing. ft )) <br /> SI• All on site roads will be paved to control PM10 particulates. VMA'1111- <br /> py <br /> �Z The propane tank shall be located or protected from potential biomass storage <br /> combustion. <br />