Laserfiche WebLink
Statement of Facts <br /> Falcon Energy Associates -3- <br /> 1. Forbidden and Class A explosives as defined i <br /> Section 173 .51 and 173 . 53 , Title 49 , Code of Federal <br /> Regulations. <br /> 2 . Hazardous wastes containing polychlorinate V <br /> biphenyls (PCB) <br /> 3 . Used oil that has a flashpoint below 100 degree <br /> Fahrenheit. <br /> 4. Used oil that contains more than 1000 ppm o <br /> chlorides. <br /> 5. Used oil that has been intentionally mixed wit <br /> 'N other hazardous wastes, other than minimal amount <br /> of vehicle fuel . <br /> II. Explanation of Draft Permit Conditions <br /> The application, Operation Plan, and supplementa <br /> documents have been reviewed and found to be complete' <br /> All conditions and terms of the permit are required unde <br /> Chapter 6.5, Division 20 of H&SC and Chapter 30 , Titl <br /> 22 of the California Code of Regulations. <br /> The General Conditions, Section II, are standar <br /> conditions including terminologies, effect of permit, and <br /> general responsibilities of the operator. <br /> Special Condition, Section III , Item A, provide <br /> requirements for disposal of wastes. Item B provide <br /> requirements for wastes prohibited at the facility. Ite <br /> C provides requirements for storage of wastes in tanks. <br /> Items D provides requirements for the recycling of <br /> wastes. Item E provides requirements for management f <br /> ignitable, reactive, or incompatible wastes. Item F <br /> provides requirements for operation at night, Item G <br /> provides requirements for manifest systems. Item H <br /> provides requirements for the analysis of wastes. Item I <br /> provides requirements for security. Item J provides <br /> requirements for inspection of the site. Item K provides <br /> requirements for personnel training. Item L providE s <br /> requirements for the Contingency Plan. Items M through i0 <br /> provide requirements for equipment, record keeping ad <br /> reporting. Items O through P provide requirements fc r <br /> closure and financial responsibilities. <br /> The Compliance Schedule, Section IV, requires reports f <br /> compliance with final requirements contained in a y <br /> compliance schedule established by the Department whi h <br /> includes method of sampling analyses, obtaining a perm <br /> t <br /> from the San Joaquin Air Pollution Control Distrlcijl <br /> disposal of the wastewater, amendment to the Operation <br /> Plan, and compliance with financial responsibility <br /> requirements. <br /> i <br />