My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007044
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5606
>
2900 - Site Mitigation Program
>
PR0541401
>
ARCHIVED REPORTS_XR0007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 2:38:29 PM
Creation date
4/14/2020 1:02:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007044
RECORD_ID
PR0541401
PE
2950
FACILITY_ID
FA0006046
FACILITY_NAME
UNION OIL STATION #5098
STREET_NUMBER
5606
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5606 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> rFIELD METHODS AND PROCEDURES <br /> The followin section describes field procedures that are to be used by ENSR personnel in <br /> 9 <br /> the performance of the tasks involved with this project <br /> rHEALTH AND SAFETY PLAN <br /> Fieldwork performed by ENSR and ENSR's subcontractors at the site will be conducted <br /> according to guidelines established in a Health and Safety Plan (HASP) The HASP is a <br /> document that describes the hazards that may be encountered in the field and specifies <br /> protective equipment, work procedures and emergency information A copy of the HASP <br /> will be at the site and available for reference by appropriate parties during work at the site <br /> r <br /> GROUNDWATER DEPTH ASSESSMENT <br /> rA water/product interface probe is used to assess the liquid-phase hydrocarbons (LPH) <br /> thickness, if present, and a water level indicator is used to measure the groundwater depth in <br /> rmonitoring wells that do not contain LPH Depth to groundwater or LPH is measured from a <br /> datum point at the top of each monitoring well casing The datum point is typically a notch cut <br />� . in the north side of the casing edge If a water level indicator is used, the tip is subjectively <br /> analyzed for LPH sheen <br /> SUBJECTIVE ANALYSIS OF GROUNDWATER <br /> Prior to purging, a water sample is collected from the monitoring well for subjective <br /> assessment The sample is retrieved by gently lowering a clean, disposable baler to <br /> approximately one-half the bailer length past the air/liquid interface The bailer is then <br /> retrieved and the sample contained within the bailer is examined for floating LPH and the <br /> appearance of a LPH sheen <br /> MONITORING WELL SAMPLING <br /> Monitoring wells are purged using a pump or bailer until pH, temperature and conductivity of <br /> the purge water has stabilized and a minimum of three well volumes of water has been <br /> removed The purge water is placed in 55-gallon drums and temporarily stored on-site <br /> pending evaluation of disposal options If three well volumes cannot be removed in one-half <br /> an hour's time, the well is allowed to recharge to 80 percent of original level After recharging, <br /> • a groundwater sample is then removed from each of the wells using a pump or disposable <br /> bailer The water sample is collected, labeled and handled according to the Quality <br />
The URL can be used to link to this page
Your browser does not support the video tag.