My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5606
>
2900 - Site Mitigation Program
>
PR0541401
>
ARCHIVED REPORTS_XR0008002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 2:57:42 PM
Creation date
4/14/2020 1:19:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008002
RECORD_ID
PR0541401
PE
2950
FACILITY_ID
FA0006046
FACILITY_NAME
UNION OIL STATION #5098
STREET_NUMBER
5606
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5606 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider.Chair <br /> rqen Arnold Schwarzmegger <br /> ea <br /> ecretary for Saerameato Maio 081ce Governor <br /> vvilronmenW Intron Address httpJ/wwwjwr&=govhwgcb$ R E C E#V E L <br /> Proteetlon 11020 Sun Center Drrvs#200 Rancho Cox}ova,CA 95670.6114 <br /> Phone(916)464-3291 OCT 0 6 20044 October 2004 <br /> Mr Bob Hopkins Mr Jay Allen <br /> Union Oil Company of California Stone Brothers Management COUVany <br /> 276 Tank Farm Road 1024 W Robinhood Dr <br /> P O Box 1069 Stoc1don,CA 95207 <br /> San Luis Obispo, CA 93406 <br /> LETTER REQUEST, CLEANUP AND ABATEMENT ORDER (GAO)NO. 5-00-707,-FORMER UNOCAL <br /> STATION#15098 AT 3606 PACIFICAVENUE,AND FORMER MONTGOMERY WARDS AUTO SERVICE <br /> AT 5400 PACIFICA VENUE,STOCKTON,SAN JOAQUIN COUNTY, <br /> Regional Board staff reviewed the 15 September 2004 Request for Extension to Restart SVE System and <br /> Evaluation of Potential Enhancement to SVE System (Letter), submitted by Unocal. The Letter proposes a date <br /> of 15 January 2005 for submitting a report recomrnendmg a proposal for enhancement to the existing SVEfAS <br /> systein,to help cease plume movement, <br /> Shackground. My letter dated 15 May 2004 requested a Workplan by 15 June 2004,to comply with <br /> CAO No 5-00-707,Order No. 15, which states "If groundwater monitoring indicates that the groundwater <br /> plume has migrated beyond laterally or vertically defined limits during the quarter, the quarterly report shall <br /> include a workplan and schedule, with work to begin within 30 days of a report submittal, to define the new <br /> plume limits and cease plume movement The Workplan,received 15 June 2004, did not include a schedule to <br /> begin work to redefining the limits of the groundwater plume within 30 days, A Notice of Violation(NOV)for <br /> CAO No 5-00-707 was issued on 18 June 2004 The NOV required implementation of the approved Workplan <br /> by 15 July 2004,and also required submittal of a Report by i August 2004,showing the steps taken to cease <br /> plume movement You did comply with both NOV deadlines by installing the monitoring wells and providing <br /> the Report,winch redefined the limits of the groundwater plume and began the process for restarting the SVE/Air <br /> Sparguig system On 14 June 20x4, the Air Sparging(AS) system was overhauled and restarted The SVE <br /> system required a new air permit, and was scheduled to start by 15 September 2004 The Soil Vapor Extraction <br /> I (SVE) system was restarted on 28 September 2004,per email notification received from your consultant ENSR <br /> International Inc (ENSR) Additionally,in a phone discussion on 3 September 2004, ENSR proposed enhancmg <br /> the SVE/AS remediation by In-Situ Chemical Oxidation, specifically Ozone Injection Since additional tirne <br /> would be required to evaluate an injection of an In-Situ Chemical Oxidation substance,I suggested that ENSR <br /> I011 -,--i .,.�,.... ar A re trtr,nr tno A <br /> to Q11W nti <br /> begin the process by providing a base'ime analysis using site sol► asIu e.��•.u•r�w-,r----- --- --- <br /> Workplan for a bench scale testing for ozone injection A pilot study for ozone injection into the aquifer would <br /> also be necessary ENSR provided email copies of the preliminary baseline analyses on 28 September 2004 <br /> I concur to the proposed 15 January 2005 deadline to provide a Report of the assessment of SVE/AS <br /> Ienhancement,provided the following due dates are met <br /> • By 15 October 2004, submit a Workplan outlining the entire process for enhancement to the existing <br /> SVE/AS system,to help cease plume movement. Also,I have reviewed existing data and request <br /> inclusion of additional monitoring wells needed to enhance the vertical and lateral extent of <br /> contaminants Specifically, adequate characterization is needed to show groundwater flow direction and <br /> California Environmental Protection Agency <br /> 2a Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.