My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5606
>
2900 - Site Mitigation Program
>
PR0541401
>
ARCHIVED REPORTS_XR0008002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 2:57:42 PM
Creation date
4/14/2020 1:19:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008002
RECORD_ID
PR0541401
PE
2950
FACILITY_ID
FA0006046
FACILITY_NAME
UNION OIL STATION #5098
STREET_NUMBER
5606
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5606 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. Army Corps of Engineers Soil <br /> Vapor Extraction Subsurface <br /> Performance Checklist <br /> Installation Name <br /> Site Name/ I D <br /> Evaluation Team <br /> Site Visit Date <br /> This checklist is meant to aid in evaluating the overall performance of a soil vapor extraction <br /> (SVE) system for removing volatile organic vapors from the soil vadose zone This checklist is <br /> divided into the following sections <br /> 1) Evaluation team composition <br /> 2) Typical treatment objectives <br /> 3) References <br /> 4) Data collection requirements <br /> 5) Performance analysis calculations <br /> 6) Adequacy of operations and maintenance <br /> 7) Typical performance problems <br /> 8) Alternatives for possible cost savings <br /> 9) Supplemental notes and data <br /> The checklist provides suggestions for information gathering, and space has been provided to <br /> record data and notes from the site visit Supplementary notes, if required, should be numbered <br /> to correspond to the appropriate checklist sections <br /> 1) Evaluation Team Composition <br /> The following disciplines should be included in the evaluation team for the soil vapor extraction <br /> system <br /> • Geologist (attend site visit, subsurface performance evaluation) <br /> • Process Engineer (attend site visit, treatment system evaluation) <br /> n��uia�vi y �y��.iau5t Li iguiawi y r Ciiuxr�iii�iiwJ <br /> • Cost Engineer (cost of alternatives) <br /> 2) Typical Treatment Objectives <br /> Verify that the treatment objectives established when the SVE system was designed and installed <br /> are clear and still valid If the objectives are not clearly defined, describe reasonable objectives <br /> based on information from the owner and regulator <br /> 06/07/99 <br /> Pagel of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.