My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5606
>
2900 - Site Mitigation Program
>
PR0541401
>
ARCHIVED REPORTS_XR0008002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 2:57:42 PM
Creation date
4/14/2020 1:19:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008002
RECORD_ID
PR0541401
PE
2950
FACILITY_ID
FA0006046
FACILITY_NAME
UNION OIL STATION #5098
STREET_NUMBER
5606
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5606 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US Army Corps of Engineers <br /> Soil Vapor Extraction Subsurface Performance Checklist <br /> Site Name 1 ID Former Unocal Service Station #5098 <br /> Contents <br /> 1 Evaluation Team Composition <br /> 2 Typical Treatment Objectives <br /> 3 References <br /> 4 Data Collection Requirements <br /> 5 Performance Analysis Calculations <br /> 6 Adequacy of Operations and Maintenance <br /> 7 Typical Performance Problems <br /> 8 Alternatives for Possible Cost Savings <br /> 9 Supplemental Notes and Data <br /> 1 Evaluation Team Composition <br /> Jim Paulson, P E , John Warren, R C E , Ben Heningburg, Project Manager, Robert <br /> L'Heureux, Staff Engineer, evaluated the system using the checklist provided by the <br /> Army Corps of Engineers Details of that evaluation are presented here <br /> 2 Typical Treatment Objectives <br /> Treatment objectives are to reduce concentrations of vapor phase petroleum <br /> hydrocarbons in the unsaturated zone beneath the site The soil vapor extraction system <br /> (SVE) at the site was designed work with an air sparging system Overall objectives <br /> include operation of the SVE system until site specific water quality objectives are <br /> achieved or until SVE is no longer a feasible remediation option for this site <br /> 3 References <br /> EM 1110-1-4001' Soil Vapor Extraction and Bioventing <br /> ENSR, Inc Monitoring Well Installation Report and Summary of Efforts to Cease Plume <br /> Movement Former Unocal Station No 5098 5400 and 5606 Pacific Avenue, Stockton, <br /> California July 18, 2004 <br /> ENSR, Inc Monthly Air Discharge Report and Analytical Results Former Unocal Station <br /> No 5098 5400 and 5606 Pacific Avenue, Stockton, California October 18, 2004 <br /> ENSR, Inc Updated Site Conceptual Model Quarterly Monitoring and Remediation <br /> Status Well Installation and Well Destruction Report, Third Quarter 2004 Former <br /> Unocal Station No 5098 5400 and 5606 Pacific Avenue, Stockton, California October <br /> 29, 2004 <br /> ENSR, Inc Work Plan and Schedule to Cease Plume Movement and Define Plume <br /> Limits within the B -Zone Former Unocal Station No 5098 5400 and 5606 Pacific <br /> Avenue, Stockton, California June 14, 2004 <br /> ENSR, Inc Work Plan to Evaluate Potential SVEIISAS System Enhancements and <br /> Additional Well Installation within the Deeper Aquifer Units Former Unocal Station No <br /> 5098 5400 and 6606 Pacific Avenue, Stockton, California November 2, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.