Laserfiche WebLink
hydrocarbons beneath the Site Once the SVE system is restarted, ENSR will <br /> collect data to provide a better understanding of the SVE system's effectiveness <br /> in remediating the target zone <br /> e Are extremely high concentrations of VOCs--at or near explosive limits— <br /> present in the extracted gas? No <br /> f Do the VOC concentrations in the extracted gas vary significantly over <br /> time? Not enough information is available to determine if VOC concentrations <br /> vary significantly <br /> g Have the total extraction rates failed to reach the expected design rates or <br /> are the extraction rates needed for efficient operation? This may be due to <br /> poor well installation, improper well design, improper flow balancing or <br /> blower design, water table upwelling, or unexpected stratigraphy <br /> Consider replacing wells, adding wells, rebalancing the air flows in the <br /> system, controlling groundwater levels, or resizing the blower Unknown <br /> what design extraction rates were ENSR has proposed the installation of one <br /> additional AS well approximately 15 feet east of MW-3 and converting MW-23S <br /> into a AS well <br /> h Is there evidence that contaminant vapors have escaped containment by <br /> the SVE system? A prolonged shutdown of both the SVE system between <br /> October 2003 and June 2004 may have resulted in an enlarged plume Since <br /> remedial efforts were restarted in September 2004, however, the plume size has <br /> reduced significantly <br /> i If the SVE and off-gas treatment systems are located outside, are there <br /> provisions to drain water lines and sump(s) when the unit is shut down'? <br /> The systems are located outside, but this specific question does not apply to this <br /> system <br /> 8 Alternatives for Possible Cost Savings <br /> The contaminant compounds remaining in the vadose soils and/or their <br /> concentrations may have changed sufficiently so that other alternatives are <br /> more cost effective Consider the following <br /> a Has the system reached its cleanup objectives? Determine if the SVE <br /> operation is still necessary, or have the concentrations decreased to that <br /> the operation can be terminated Can the off-gas treatment system be <br /> taken off line due to decreased levels of contaminants in the vapor stream? <br /> No, the system has not achieved its cleanup objectives No, the off-gas <br /> treatment cannot be taken off-line Extractions wells VEW-2 and MW-19S <br /> reporting elevated concentrations in vapor samples collected in September and <br /> October 2004 <br /> b If the cleanup objectives have not yet been met, can the system be turned <br /> off and natural attenuation be allowed to achieve the cleanup objective <br /> while remaining protective of human health and the environment? Based <br /> on concentrations in groundwater, the operation of the SVE should be re- <br />