Laserfiche WebLink
TABLE 3 <br /> COST ESTIMATE <br /> OLD VALLEY LINE, MILE POST 215 <br /> TRACY, CALIFORNIA <br /> Prepare Worts Plan <br /> EMCON Labor $3,600.o0 <br /> Task 1 Prefield Activities <br /> EMCON Labor $2,000.00 <br /> Expenses $200.00 <br /> Outside Services $600.00 <br /> Permits $665.00 <br /> Total Task 1 $3,465.00 <br /> Task 2 Soil and Shallow Groundwater Sampling <br /> EMCON Labor $2,900.00 <br /> Equipment/Expenses $500.00 <br /> Outside Services $7,700.00 <br /> Total Task 2 $11,100.00 <br /> Task 3, Subtask 3.1 Monitoring Well Installation <br /> EMCON Labor $1,300.00 <br /> Equipment/Expenses $550.00 <br /> Outside Services $5,400.00 <br /> Total Task 3 $7,250.00 <br /> Task 3, Subtask 3.2 Well Development and Groundwater Sampling <br /> EMCON Labor $900.00 <br /> Equipment/Expenses $200.00 <br /> Materials $50.00 <br /> Total Task 4 $1,150.00 <br /> Task 4 Chemical Analyses <br /> Geo r�(10 locations-2 soil and 1 groundwater sample(s)/location) <br /> 8015M 31 samples @ $72/sample $2,232.00 <br /> 8020 (31 samples @ $55/sample) $1,705.00 <br /> 8310 (11 samples @ $220/sample) $2,420.00 <br /> Monitoring well installation <br /> 8015M (6 samples @ $72/sample) $432.00 <br /> 8020 (6 samples @ $55/sample) $330.00 <br /> 8310 (3 samples @ $220/sample) $660.00 <br /> AAMile215\215costs.xfs gtf:2 6/29/95 <br />