My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
413
>
2900 - Site Mitigation Program
>
PR0505861
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 4:30:44 PM
Creation date
4/14/2020 2:13:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505861
PE
2960
FACILITY_ID
FA0007056
FACILITY_NAME
MOUNTAIN VIEW TOWNHOMES
STREET_NUMBER
413
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
TRACY
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
413 MONTE DIABLO AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 14, 1995 <br /> Project 2560-203.01 <br /> Mr. Don O. Culbertson <br /> Chevron Pipe Line Company <br /> 4000 Executive Parkway, Suite 400 <br /> San Ramon,California 94583 <br /> Re: Addendum to Work Plan for Site Assessment, Old Valley Line, Mile Post 215,Tracy <br /> Dear Mr. Culbertson: <br /> This work plan addendum was prepared to address comments in a July 26, 1995 letter by the <br /> Regional Water Quality Control Board (RWQCB) to the Work Plan for Site Assessment, Old <br /> Valley Line, Mile Post 215, Tracy prepared by EMCON. The first response below addresses a <br /> misinterpretation of the work plan. The remainder of the responses address comments on the <br /> work plan. <br /> Response to Comments <br /> On page 2 of the COMMENTS ON WORK PLAN FOR PHASE II REMEDIAL <br /> INVES77GATION, MOUNTAIN VIEW TOWNHOMES, TRACY, SAN JOAQUIN COUNTY by <br /> the RWQCB under WORK PLAN PROPOSAL, Soil, which summarizes EMCON's work plan, <br /> it states: "Geoprobe soil samples will be analyzed for total extractable petroleum hydrocarbons <br /> (TEPH) by modified EPA Method 8015, for aromatic VOCs by EPA Method 8020, and for <br /> PNAs by EPA Method 8310." <br /> The work plan states that all geoprobe soil samples submitted for chemical analysis will be <br /> analyzed for total extractable petroleum hydrocarbons as crude (TEPH) by U.S. Environmental <br /> Protection Agency (EPA) method 8015 modified (m) and for benzene, toluene, ethylbenzene, and <br /> xylenes (BTEX) by EPA method 8020. Only one soil sample collected from each geoprobe <br /> boring will be analyzed by EPA method 8310. <br /> An additional Geoprobe boring should be placed between Areas 4 and 7 to ensure adequate <br /> representation of the site along the pipeline. <br /> Three geoprobe sites completed in the vicinity of Area 4 should be sufficient to characterize soils <br /> and groundwater around Area 4. One of the borings originally proposed for Area 4 will be <br /> moved to the northwest between Areas 4 and 7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.