My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081894 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOWARD
>
6565
>
2600 - Land Use Program
>
SR0081894 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 5:03:25 AM
Creation date
4/14/2020 3:05:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081894
PE
2602
STREET_NUMBER
6565
Direction
W
STREET_NAME
HOWARD
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
18922003
ENTERED_DATE
3/16/2020 12:00:00 AM
SITE_LOCATION
6565 W HOWARD RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY.............................................................................................1 <br /> Introduction.................................................................................................................1 <br /> Proposed Development..............................................................................................1 <br /> SiteDescription...........................................................................................................1 <br /> Existing and Proposed Septic Tank Usage..............................................................2 <br /> ExistingSeptic System...................................................................................2 <br /> ProposedSeptic System................................................................................2 <br /> On-Site Septic Permit History.........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity.....................................................2 <br /> Septic Permit History in the Vicinity................................................................2 <br /> Ground Water Information .........................................................................................3 <br /> Depthand Gradient........................................................................................3 <br /> Potential Ground Water Contamination Issues..............................................3 <br /> On-Site Wells..................................................................................................4 <br /> WaterSample.................................................................................................4 <br /> Soil Profile and Geologic Information.......................................................................4 <br /> SoilBorings....................................................................................................5 <br /> Discussion of Soil Lithology............................................................................5 <br /> PercolationTest..........................................................................................................5 <br /> Preparation and Presaturation of Percolation Test Holes..............................5 <br /> Percolation Test Procedure............................................................................5 <br /> PercolationTest Results ................................................................................6 <br /> Discussion of Percolation Test Results..........................................................6 <br /> Discussion of Septic System Sizing............................................................... 7 <br /> NITRATE LOADING STUDY...........................................................................................8 <br /> Mass Transport Soil Properties.................................................................................8 <br /> Sourcesof Nitrate.......................................................................................................9 <br /> Percolating Recharge Waters....................................................................................9 <br /> Qualityof Rainwater...................................................................................................9 <br /> Quantity and Quality of Domestic Wastewater......................................................10 <br /> Denitrification Reductions.......................................................................................11 <br /> Nitrate Loading Estimate..........................................................................................11 <br /> Discussion of Nitrate Loading Results...................................................................13 <br /> Total Nitrate Impact...................................................................................... 13 <br /> CONCLUSIONS AND RECOMMENDATIONS..............................................................14 <br /> LIMITATIONS.................................................................................................................15 <br /> SELECTED REFERENCES...........................................................................................16 <br /> LOGE 1950 <br />
The URL can be used to link to this page
Your browser does not support the video tag.