My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:24:15 PM
Creation date
4/15/2020 2:02:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Well Construction Details <br /> Chapin Brothers <br /> 1766 Monte Diablo, Stockton California <br /> Well ID Well Diameter Total Depth Screen Interval Tagged Depth on TPHg Concentrations Proposed Well <br /> (inches) (feet) (feet bgs) 2/11/2010 on 2/11/2010 Destruction Method <br /> AS-1 2 27 -- -- -- Tremie Grout <br /> ASO-1 2 38 -- -- -- Tremie Grout <br /> IAS-1* 3/8 30 -- -- -- Over Drill <br /> IAS-2* 3/8 30 -- -- -- Over Drill <br /> IAS-3* 3/8 30 -- -- -- Over Drill <br /> IAS-4* 3/8 30 -- -- -- Over Drill <br /> IAS-5* 3/8 30 -- -- -- Over Drill <br /> IAS-6* 3/8 30 -- -- -- Over Drill <br /> IAS-7* 3/8 30 -- -- -- Over Drill <br /> IAS-8* 3/8 30 -- -- -- Over Drill <br /> MW-1 2 30 17-30 30 ND<50 Tremie Grout <br /> MW-2 2 35 25-35 35 ND<50 Tremie Grout <br /> MW-3 2 30 15-30 30 2,300 Over Drill <br /> MW-4 2 35 15-35 31.2 740 Over Drill <br /> MW-5 2 25 6-25 25 ND<50 Tremie Grout <br /> MW-6 2 30 10-30 30 ND<50 Tremie Grout <br /> MW-7 2 25 5-25 25 ND<50 Tremie Grout <br /> EW-1 6 30 10-30 -- 480 Over Drill <br /> EW-2 6 30 10-30 -- 830 Over Drill <br /> EW-3 6 30 10-30 -- 3,400 Over Drill <br /> EW-4 6 30 10-30 -- 4,000 Over Dri I I <br /> Well Construction Details Page I of 2 Closure Solutions.Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.