Laserfiche WebLink
TABLE 1 <br /> Well Construction Details <br /> Chapin Brothers <br /> 1766 Monte Diablo, Stockton California <br /> Well ID Well Diameter Total Depth Screen Interval Tagged Depth on TPHg Concentrations Proposed Well <br /> (inches) (feet) (feet bgs) 2/11/2010 on 2/11/2010 Destruction Method <br /> AS-1 2 27 -- -- -- Tremie Grout <br /> ASO-1 2 38 -- -- -- Tremie Grout <br /> IAS-1* 3/8 30 -- -- -- Over Drill <br /> IAS-2* 3/8 30 -- -- -- Over Drill <br /> IAS-3* 3/8 30 -- -- -- Over Drill <br /> IAS-4* 3/8 30 -- -- -- Over Drill <br /> IAS-5* 3/8 30 -- -- -- Over Drill <br /> IAS-6* 3/8 30 -- -- -- Over Drill <br /> IAS-7* 3/8 30 -- -- -- Over Drill <br /> IAS-8* 3/8 30 -- -- -- Over Drill <br /> MW-1 2 30 17-30 30 ND<50 Tremie Grout <br /> MW-2 2 35 25-35 35 ND<50 Tremie Grout <br /> MW-3 2 30 15-30 30 2,300 Over Drill <br /> MW-4 2 35 15-35 31.2 740 Over Drill <br /> MW-5 2 25 6-25 25 ND<50 Tremie Grout <br /> MW-6 2 30 10-30 30 ND<50 Tremie Grout <br /> MW-7 2 25 5-25 25 ND<50 Tremie Grout <br /> EW-1 6 30 10-30 -- 480 Over Drill <br /> EW-2 6 30 10-30 -- 830 Over Drill <br /> EW-3 6 30 10-30 -- 3,400 Over Drill <br /> EW-4 6 30 10-30 -- 4,000 Over Dri I I <br /> Well Construction Details Page I of 2 Closure Solutions.Inc. <br />