My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUSS CHAPIN 249-464-6947 11-17-95 07:46 P.42 <br /> Liu st <br /> GEOSCIF.NCES <br /> jkOl,tx,n:AL ANj1 LNVtRnN1ArKTAL SER.V)CE�1 <br /> NvvCnlbCr 15, 1995 <br /> 530.001 <br /> I <br /> Mr, Russell F. Chapin,Sr. <br /> 1203 North Carlton Avenue <br /> %)ckton.California 95203 <br /> tiuhjecl: Proposed Work Plan for Site Remediation <br /> C,lia in Bros.Inc. Facility <br /> 1765 Mottle Diablo Avenue,Stockton,California <br /> Dcar Mr. Chapin: <br /> This Work flan presents our understanding of the status of the Chapin Bros,Inc, Rite <br /> located at 1706 Monte Diablo Avenge in Stockton,California;and describes proposed remedial <br /> work to mitigale contamination at the site. The proposed scope of work is prepared as delineated <br /> ill the Final Remedial Plan prepared by Geological Audit Services,with modifications and <br /> Alternative procedures which we feel will bring about a mors successful,0031-effective, and <br /> titttely solution to the problem. <br /> SITE DACKGROUNU <br /> Malcrials you supplied included data stunmarized as follows: <br /> 'Ibc site operated as a service station from the late 1930's until 1990. Approximately 7 <br /> underground gasoline larks and one waste oil tank are known to have been present onsite, <br /> All known tanks have been abandoned,Although three tattles may have been abandoned in <br /> place while the others were removed in 1993. <br /> Previous work has included construction of one monitoring well In 1990 by roger Foott <br /> Associates,inc., which showed that soil and groundwater contamination were present, <br /> 35601}1_+SJNESS PPAVE, SuIiE 170 • SACNAWNTO,CA 95820 o 916 73 --9294 ■ FAX19Hl_'717-91-R <br />
The URL can be used to link to this page
Your browser does not support the video tag.