My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUSS CHAPIN 249-464-6947 11-17-95 07:51 P.10 <br /> SUM14AItY OF ysTit4ATED COSTS <br /> St1BSURFAC>� PIN BK CT�rpCli I'!-Y lGATIt)N <br /> CHA <br /> S10C PAGE ORNIA <br /> 3 OF <br /> TASK 6- yE1tIFICATION SAMPLING AT2 da <br /> 0 MP1.F ON $780,00 <br /> Staff 00019 ist 1 y $,450 $40.00 <br /> Field Vehicle 1 day $100 $100'00 <br /> organic Vapor Meter 36 $7 $252.00 <br /> Brass sltsvts 24 1 $50 31,200.00 <br /> SampleArut1 ses 3L8(10.Q4 <br /> Pettctrtl=ntimlE <br /> and salcA l2 st Vincludes travel, <br /> $4,172.00 <br /> TASK 7 -OFFICE OPMATIONS AND RE$RTIN X90 $720.00 <br /> Senior Geologist $1,700.00 <br /> 20 hrs $90 <br /> Project Geologist 20hrs $50 $2,160.00 <br /> Staff Geologist36 B hrs $40 $320.00 <br /> Drafter 4 hrs $40 $160.00 <br /> Administrative _—$40M <br /> Reproduction $5,140.00 <br /> TASK @-QUARTERLY MONITORING <br /> 'technician 1 day S40 $A0.00 <br /> Field Vehicle to hm $55 $550.00 <br /> Field time ,$500.00 <br /> Sampling Equipment <br /> Laboratory nalyats(1-week turnaround) S $50/ea. $250.00 <br /> Report Preparation 6 hrs {0) $90 $540.00 � <br /> Senior Geologist 6 hrs $60 $360.00 <br /> Staff Geologist ; <br /> hrs $40 $120.00 <br /> Drafter S hrs $40 $200.00 <br /> Administrative _60,04 <br /> Reproduction $2,624.00 <br /> Total for Ont Quarttr(CObt per Quarter) $10,480.00 <br /> Cast Per year <br /> 59(1,926 in$93,626 <br /> TOTAL FSTIMATEU COST(One Y000 $53,700.00 <br /> TOTAL.EST m MD COST(Second Year) <br /> 1,[1511 C3�c��{SIE I <br />
The URL can be used to link to this page
Your browser does not support the video tag.