My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Russell F. Chapin, Sr. <br /> November 15, 1995 <br /> Page 6 <br /> BUDGET AND SCHEDULE <br /> Work will begin on the project as soon as possible after acceptance of this work plan by <br /> San Joaquin County and authorization to proceed is given by the site owners. Initial work will <br /> include acquiring permits to construct the required groundwater monitoring and vapor extraction <br /> wells, sample collection and analysis, and design and permitting of the remedial system. These <br /> items are expected to require as little as three weeks to as much as 2 months to complete. The <br /> system will be installed and operated as soon as possible after receipt of permission to construct <br /> the unit. The internal combustion engine unit is expected to be used for at least 6 months, but is <br /> not judged likely to be cost effective beyond one year. <br /> Thank you for this opportunity to be of service to you. <br /> Sincerely, <br /> LUSH GEOSCIENCES <br /> °� <br /> Andrew P. Lush <br /> President I'* Np, gg21 <br /> 4058-P3 <br /> LUSH GEOSCIENCES <br />
The URL can be used to link to this page
Your browser does not support the video tag.