Laserfiche WebLink
i <br /> TASl�,' 3 - Monitoring <br /> The unit will be monitored an a' daily basis for:the first two weeks. After' the sy$teui llas <br /> stabilized, the relit will be monitored ori a weekly basis. Monitoring includes collection of .. <br /> HD measurements, vapor readings, ,etc. <br /> Initial (start-up) monitoring will be $1,200.00, <br /> Weekly Monitoring will be $400.00,per.nlonth;'$4,8.00.00 for one (1) year. <br /> Collection of air Samples o.11 1 1110.1101.1ybasis,•$.1.00.40 per xlloutl}; $1,200.00 for one <br /> (1) year.. , <br /> .r <br /> TASK4 - Progress Soil Sampling, ; <br /> Soil samples will be collected approximately each six ulontlls, either by hollow-stem auger <br /> clrillillg or Geoprobe. <br /> 'rile: cost for each sampling event, including soil salllple collecti011 and analysis, will <br /> be $:11000.00; $6,000.00 for one year. <br /> TASI� S - System Maintenance . <br /> System maintenance of the unit iticludes Ielbrieation, oil changes, etc. The cost for monthly <br /> maintenance should not exceed $200.00 per.llloilth; $2, 100.00 per year. <br /> 1lase(l upon one year of operation, the cost for the V1:/IAS project will be approximately <br /> $39,000.00. l lo\\-ever, it should be noted that the above costs are estimates; a more detailed <br /> proposal is presently being prepared by AGE jnd will be submitted wlthlrl the Next ie w clays. <br /> Based upon the existing inforulatiorl concerning the. site,.we recommend Consideration of <br /> the purchase of a new Vi unit. After Chapin Bros. lac. has cpnlpleted use of the 1C unit, <br /> the system could be resold or leased for use at other sites. <br /> If you (hive wily questions or Colnlllellts, please contact me at (209) 956-02G-1• <br /> Sincerely, <br /> i <br /> :tclrucurd GCoElIvil•01111lental, Inc. <br /> 1 , <br /> Iiob Marty <br /> Director of Operations <br /> 2 <br />